Building Complaints

19.11.2016 I paid 3/4 of the price for a freestanding fireplace. The arrangement was that the fireplace was to be installed latest mid January. End of January I am still waiting for my fireplace. By now all other contractors are finished, painting and all. Countless phone calls later, endless excuses, even more promised installation dates missed... Every time I move furniture, interrupt my work schedules and the frustration level rises. No one at Family Fires seems to care about the...

Category : Building

(0) Replies

Country : South Africa

I order a converted container from GCP Construction Projects last year and to date, it has not been delivered. I was introduced to a Mr. Reg Stewart (I think he is the CEO of the company). He was a very nice gentleman to deal with. We concluded the deal and I paid over the monies to him in return for the container. There was a delivery date between 5 to 10 days and I accepted it. After 10 days I followed up with Mr. Stewart and he informed me that the container would be delivered. I make...

Category : Building

(0) Replies

Country : South Africa

This people take forever to pay out.Very bad insurance

Category : Building

(0) Replies

Country : South Africa

My name is Nancy Mapatha based in tembisa , lodging complaint on behalf of my pensioner mum Francine madiba. Monday she went to buy tiles at the following factory:Techtile in polokwane ,31 platinum street ladana and they promised to delivery on Thursday,however they didn't delivery ,Friday as well,today she went to the shop that's where she got the worst service she was even crying ,the white lady told her to get off and through her out of the shop when she was asking reason at to why her...

Category : Building

(0) Replies

Country : South Africa

I had the above company doing plumbing repairs for me (personal not company) It says above electrical, but both (2) persons at my premises did not even know how to switch a timer back on. I had no hot water when they came they could not fix it because it was an old geyser and suggested I contact a fault finder. They did however replaced two washers hot and cold taps and the inners of the toilet bowel. It took them over 4 hours to do the job. I was told the toilet was blocked,...

Category : Building

(0) Replies

Country : South Africa

Good day I rented a property with a 1 year lease and took occupancy on the 15th April 2016, however paid my deposit from the 1st April 2016. The following was not handled by the agent:' I had to ask for a check list and it was only provided on the 28th April 2016. There were ongoing problems and due to the fact that the agent acted in a unprofessional manner I contacted the owner who sorted out the additional issues with no problemj I vacated the premises on the 28th March 2017. The...

Category : Building

(0) Replies

Country : South Africa

We are a small service delivering company named Tarka Enviro Chem cc,(mobile toilets and service) based in the Eastern cape.Our challenge is non payment from our client since Janusry 2017. We cannot access their Head Office as branch in East Londen is not allowed to give HO info. We stopped services on site due to repeated requests for payment without any avail. Our equipment is still on their site in Lady Grey EC. After numerous phone calls to the branch and site office and a email on...

Category : Building

(5) Replies

Country : South Africa

I had my house painted in September 2015 by the above company. The contract stated that I have a ten (10) year guarantee on the work done. That includes cracks etc. The contractor and a representative of the company came to view the house on Saturday 25th February and to date, after following up at least once a week, I have not had any reply. Please assist. Regards Reneé

Category : Building

(0) Replies

Country : South Africa

Marius from Muller Management Construction quoted me on re doing my carport. I agreed to Marius doing the job. Marius came out to begin the dismantling of rotted wood to replace with steel. This was done but I was not happy with the way the gutter was replaced, I informed him that he needed to put a proper gutter on nit a flat gutter, he had flattened my existing gutter and sealed the edge with 1 layer of waterproofing bandage, this washed off when we had rain, I contacted his assistant cindy...

Category : Building

(6) Replies

Country : South Africa

I had the above company install a carport at my home about a month ago. After the recent rain it leaks at every joint.I have paid the contract already and attempts to get hold of the contract who advertisers in the local community newspaper as been futile. further upon inspection of my Roof to which the carport is attached revealed numerous tiles and gutters that were damaged which is now costing me even more to replace.

Category : Building

(4) Replies

Country : South Africa

These group of maggots who call themselves property management agencies, fail to manage a building and charge ridiculous electricity bills with a recent spate of including DEE 1 unit consumption of above half of my domestic consumption. the building has no keytaker, hobbos are finding comfort in front of the kassy's Place building in blairgowrie.

Category : Building

(6) Replies

Country : South Africa

These group of maggots who call themselves property management agencies, fail to manage a building and charge ridiculous electricity bills with a recent spate of including DEE 1 unit consumption of above half of my domestic consumption. the building has no keytaker, hobbos are finding comfort in front of the kassy's Place building in blairgowrie.

Category : Building

(6) Replies

Country : South Africa

These group of maggots who call themselves property management agencies, fail to manage a building and charge ridiculous electricity bills with a recent spate of including DEE 1 unit consumption of above half of my domestic consumption. the building has no keytaker, hobbos are finding comfort in front of the kassy's Place building in blairgowrie.

Category : Building

(5) Replies

Country : South Africa

My mother-in-law of 85 years old vacated her unit in Jacaranda Retirement Village due to illness. It soon became apparent that life on her own in Jhb was not the way forward. So she notified the Managing Agents that she wished to sell the Life Rights contracted property. It was quickly sold and a new resident took up ownership whilst awaiting payments to be finalized. No mention was made of Occupational Rent until we demanded it be paid. After full payment had been completed these rents...

Category : Building

(5) Replies

Country : South Africa

I contracted with Gabriel G Build PTY LTD to reduce the size of my existing pool and build a boma area. The price was agreed and the scope of work detailed and signed off.Jerry Motea the Principal provided a time frame to have the work completed with 16 days, and as such the completion date was set for 14 December 2016.The Contractor insisted in a 50% upfront deposit being paid.The work started at a very slow pace with two unskilled workers being placed at the job with no supervision. despite...

Category : Building

(5) Replies

Country : South Africa

Good day Sir/ Madam My name is Stephen B Mokoka, Me and my wife Sonia Mokoka we have tried to buy a property in Pretoria west Frederika Street to the Auctions but the Auction was never advised by the Apollo assets we try by the properties, but with the unlucky the property was not evict them and the bank said the house its needs to be repaint. Then the owner said he won’t take that offer is small then in the mean time we spoke to Johanna the guy who is working at Apollo Assets...

Category : Building

(7) Replies

Country : South Africa

I moved into one of their properties in October 2016, Gave a notice that I am moving out end of feb and before putting notice i spoke to Felicity Ziyambi. I moved end of Feb and was told that they wil charge me R650 for carpet cleaning. My deposit was R3500 plus addidtional amounts which amounted to R9100 including first months rent. my question is how can the refund be R473 on top of the amount which I paid for deposiT

Category : Building

(4) Replies

Country : South Africa

we have been clients with absa insurance company +-35years (policy no 6511579447). We had accessive rain and the kitchen roof leaked which damaged the ceiling inside. We asked absa for the claim (claim no 3223332). a Week later absa send an assessor. a Week later with no response from absa I contacted them and they informed me the claim is denied as there was no maintenance done last year on the roof. They informed me that we need to do maintenance each year. No where does it inform that...

Category : Building

(6) Replies

Country : South Africa

Poor service by Rustenburg Plumblink Rustenburg. I bought 7 Springbok Basins with 14 brackets when delivering they only brought 7 basins with 7 brackets on the 15 February 2017 Instead of 14 brackets. I further paid for 7 brackets but up until today they are taking me from pillar to post and it has been a month without any assistance from them. I am getting penalties from the client because of them. I don't know what to do. The person who was assisting me is Joseph Malinga. I trusted them and...

Category : Building

(5) Replies

Country : South Africa

I PAID ERNST DU PLESSIS 75% of his quote to install new cupboards in kitchen. he removed old kitchen about 3 weeks ago and now there is no kitchen and new cupboards. He keeps on telling me lies about where the cupboard are but cannot even produce a photo of the cupboard.

Category : Building

(5) Replies

Country : South Africa

1 2 3 4 5 6 ... 8 9 10Next